High River, Calgary
In 2013, Calgary experienced massive flooding that affected over 100,000 people and was estimated to exceed $5 billion in damages. All 13,000 residents of High River, Calgary were evacuated due to this flood. Being a DSN accredited firm, Alpine Construction was called in to assist with this national catastrophe. Alpine acted in a supervisory role leading several construction teams on the restoration efforts.